Menu

Iets gezien in de stad? Meld het aan onze redactie

Site by wieni

Drilling tests for the new subway: We're trying to find the best route'

© tvbrussel
06/12/2017
Also in:
en nl fr

In 17 different places in Evere en Schaarbeek, drilling tests have been carried out to determine if the underground is stable enough for a subway tunnel. By 2024, the Brussels Region would like to open a line between Albertplein in Vorst and Bordet station in Evere. This type of drilling is meant to avoid bad surprises during the actual works.

Fijn dat je wil reageren. Wie reageert, gaat akkoord met onze huisregels. Hoe reageren via Disqus? Een woordje uitleg.

Read more about: BRUZZ 24 , Evere